Skip to page content

ReasonSpan™ · Transparent content status

See what has been checked.

Internal checks and independent specialist review answer different questions. We publish their status separately. A correct sampled response or saved reflection is not a pass prediction.

Status updated October 12, 2026 UTC. Original workshop edition 2026-10-12.1; targeted repairs and fresh-check edition 2026-10-12.3.

Ten workshops, twenty original decisions and ten fresh follow-up problems
WorkshopInternal QCIndependent specialist reviewObserved candidate trials
Unknown outlet temperatures: choose the exchanger model
PE Mechanical: HVAC and Refrigeration
Calculation, content, rendering and automated checks completed
October 12, 2026 UTC
PendingPending
Select VRF equipment from the operating envelope
PE Mechanical: HVAC and Refrigeration
Calculation, content, rendering and automated checks completed
October 12, 2026 UTC
PendingPending
Recover energy without crossing the prohibited air path
PE Mechanical: HVAC and Refrigeration
Calculation, content, rendering and automated checks completed
October 12, 2026 UTC
PendingPending
A safety latch changes what the controller may do
PE Mechanical: HVAC and Refrigeration
Calculation, content, rendering and automated checks completed
October 12, 2026 UTC
PendingPending
Cold air: separate mass basis from frost-point lookup
PE Mechanical: HVAC and Refrigeration
Calculation, content, rendering and automated checks completed
October 12, 2026 UTC
PendingPending
A code screen starts with applicability, not arithmetic
PE Mechanical: HVAC and Refrigeration
Calculation, content, rendering and automated checks completed
October 12, 2026 UTC
PendingPending
A delay can change which path controls
PE Civil Construction
Calculation, content, rendering and automated checks completed
October 12, 2026 UTC
PendingPending
Translate ponded depth into the structural check
PE Architectural Engineering
Calculation, content, rendering and automated checks completed
October 12, 2026 UTC
PendingPending
Repair the air path without defeating drainage
ARE 5.0 Project Development and Documentation (PDD)
Calculation, content, rendering and automated checks completed
October 12, 2026 UTC
PendingPending
Approval status changes the project manager's next action
PMP
Calculation, content, rendering and automated checks completed
October 12, 2026 UTC
PendingPending

What internal QC covers

The October 12 AI-assisted technical audit also challenged physical-state consistency, distractor meaning and changed-condition transfer. Two HVAC fresh checks were revised with new question identities; earlier starts retain their original questions. Inspect the full HVAC module audit status.

  • Independent recalculation from the authored givens, dimensional consistency and one justified answer.
  • Distinct item identities, original settings, per-choice explanations and readable supplied data.
  • KaTeX parsing, response persistence, first-response retention and server-enforced follow-up availability.
  • Account isolation, stale-write handling and withholding follow-up answers until the first response is checked.

These checks do not establish calibrated difficulty, independent subject-specialist certification or production browser/mobile accessibility. Reflections, reference locations and repair completion are self-reported.

What independent review still needs to do

A qualified reviewer should solve each case blind, challenge every distractor, verify the reference route and identify unrealistic or ambiguous assumptions. Record the reviewer, qualifications, date, findings and resulting corrections before claiming completion. No such review or candidate trial is currently claimed.

Fresh checks become available 24 hours after a saved repair. This operational interval is not asserted to be optimal. Each check is a single study sample; no instructional hours, readiness certificate or pass guarantee is awarded.