Decision Lab · E4 · Simultaneous duty and corrected capacity
Select VRF equipment from the operating envelope
A large nameplate capacity can still fail the actual job. Test operating mode and each delivered duty before recommending equipment.
By the end of this workshop
- Choose a method that respects the supplied conditions.
- Explain how a changed condition affects the decision.
- Identify a physical or procedural cross-check and an applicability limit.
- Record the assumption you would verify next time.
Start with the complete model
Givens and assumptions
- Two zones simultaneously need 60,000 Btu/h cooling and 30,000 Btu/h heating.
- The table supplies corrected delivered capacities at the stated design condition, including the required piping and defrost corrections. They are hypothetical selection data, not a real product catalog.
- Simultaneous operation is mandatory. Evaluate only the listed duty constraints; remaining selection checks are separate.
| Option | Simultaneous heating/cooling? | Corrected cooling / heating, Btu/h |
|---|---|---|
| A · common-mode heat pump | No | 84,000 / 66,000 |
| B · heat recovery | Yes | 82,000 / 42,000 |
| C · heat recovery | Yes | 78,000 / 24,000 |
Study calculator, scratch notepad and whiteboard
Sketch a control volume or air path with a mouse, pen or touch. Ink stays in this page session and clears on reload. Use the response and reflection fields as a keyboard alternative. Sign in before starting and save a reflection to retain your reasoning.
1 · Choose the method
Which listed option satisfies simultaneous 60,000 Btu/h cooling and 30,000 Btu/h heating at the supplied design condition?
2 · Change the condition
Predict before you inspect the calculation.
The coincident cooling duty rises to 88,000 Btu/h; heating remains 30,000 Btu/h.
- Simultaneous cooling/heating remains mandatory. Corrected capacities: A 84,000/66,000 without simultaneous mode; B 82,000/42,000 with simultaneous mode; C 78,000/24,000 with simultaneous mode.
- Required delivered duties are now 88,000 Btu/h cooling and 30,000 Btu/h heating.
Check the first decision to open the changed-condition response.
Reference navigation drill
Search concept: refrigeration, heat pumps, capacity
Distinguish a cycle energy balance from an equipment-selection envelope. Identify which performance data the original problem supplies.
Where this model stops
The capacity table is original hypothetical data. Real selection requires manufacturer simultaneous-operation ratings, capacity corrections, refrigerant and piping checks, controls and applicable safety requirements.
The PE Mechanical: HVAC and Refrigeration examination uses the NCEES PE Mechanical Reference Handbook. These source links provide study context; they are not additional exam-day references.
- Daikin · simultaneous VRV heat-recovery operation ↗
- NCEES · current PE Mechanical: HVAC and Refrigeration specification ↗